I have a flow that runs three tasks (visually) in parallel. I want to stop the entire run if one of the three tasks meet a particular condition. Is it possible to “kill” a sibling parallel task?
1 Like
Interesting. This should be possible. Can you share your workbook link and a run link where the condition is being met? You can find the run link on the https://www.gumloop.com/history page.
Also please set the share access to ‘anyone with the link can view’
This topic was automatically closed 60 minutes after the last reply. New replies are no longer allowed.