Huge overcharge of credits

https://www.gumloop.com/pipeline?workbook_id=eTw11sMa6PFLdiDakxA5RN

There was an issue, it was caught, errorshield added.

Workflow resumed.

Felt instant, but timing shows ~1min, it used ~17000 credits.

While I was looking at the details to understand what’s going on, it spent 60000 credits. (in about 4minutes)

I’ve run this before; I tested it this time on five rows this time. It costs no where near that much to run.

Please help.

Hey @cvgrubbs! If you’re reporting an issue with a flow or an error in a run, please include the run link and make sure it’s shareable so we can take a look.

  1. Find your run link on the history page. Format: https://www.gumloop.com/pipeline?run_id={{your_run_id}}&workbook_id={{workbook_id}}

  2. Make it shareable by clicking “Share” → ‘Anyone with the link can view’ in the top-left corner of the flow screen.
    GIF guide

  3. Provide details about the issue—more context helps us troubleshoot faster.

You can find your run history here: https://www.gumloop.com/history

Capture60k

Capture17k

Normally, I don’t spend my entire monthly supply, let alone 60k in 5mins

Hey @cvgrubbs – It seems like you were processing 759 rows from your spreadsheet here which is why you’re seeing the increased credit cost:

Since you didn’t get the desired results here, I’m happy to run it on my end if you’re able to share the spreadsheet with me: wasay@gumloop.com

Thank you.

Just to understand, you’re saying this was normal operation?

The time vs spend is where I’m seeing a problem. Earlier tests and runs had nothing close to 17k/min spend.

Shared sheet, thanks.

Thank you @cvgrubbs – I emailed you the details of the run :slight_smile:

This topic was automatically closed 20 days after the last reply. New replies are no longer allowed.